Brief Profiles Of Investment Projects
For China's Agenda 21

 

Title Production of Municipal Solid Waste-to-Energy Incinerator
Type Expansion production capacity
Description   
HBW now has capacity to produce 8 incinerators per year of 150 tons per day capacity. This project will expand the company's capacity to produce 4 larger incinerators per year, with 400 tons per day capacity. Design technology for the larger incinerator will be imported as well as some of the auxilary incinerator components. Production level will depend on the number of firm delivery contracts.
Rationale   
China's Agenda 21 has designated municipal solid waste incineration as a priority area. Incineration of municipal solid waste can reduce the weight and volume efficiently (by 75% and 95% respectively). Relevant regulations require that the rate of incineration of solid waste should reach 3% by the end of "Ninth Five Year Plan". At the present time, however, only one solid waste incinerator with a capacity of 150 tons per day has been produced in China, by HBW for the Shengzhen waste treatment plant. The price of the boiler produced by HBW is about US$ 2.2 million, which is much lower than an imported incinerator with the same capacity.
Products   
Solid Waste Incinerator, 4 units with a capacity of 400 tons/day each year
Location Hangzhou city, Zhejiang pronvice
Available Information Market Study
Total Investment (US$)

1.5 million

Foreign Currency (US$)

0.9 million

Financing

Co-operation Sought

Total Equity (US$)

1 million

Lisencing

Of which Equity Foreign Partner (US$)   

Sub-contract

Loan (US$)

0.5 million

  
Others(specify) (US$)      
Indicators of Viability   

INFORMATION ON SPONSOR

Name Hangzhou Boiler Works (HBW) Tel +86-571-5371968
Address 17 Dongxin Road, Hangzhou city, Zhejiang pronvice Fax +86-571-5377420
Annual Turnover (US$) 1993 22.5 million 1994 25.4 million 1995 28.1 million
Year of Establishment 1955 No. of Employees 2301 Ownership State
Fixed Assets (US$) 180 million Registered Capital (US$) 7.9 million
Land (ha.) 27.7 Building (m*m) 141,000 Equipment (US$) 5.4 million

 


Text Browser Utilities: [Contents Home Page]