Brief Profiles Of Investment Projects
For China's Agenda 21

 

Title Expansion of the Chengde Thermal Power Plant
Type Expansion of power plant
Description
The capacity of the Chengde power plant will be expanded with the addition of two 75 t/h ( or four 35 t/h) medium-pressure steam boilers and a 12,000 kW steam generating unit. This new, more advanced equipment will be installed in the reserved land adjacent to the existing plant. The generating capacity will be 72 million kWH per annum. 54 million kWH in excess of auto-consumption will be available for transmission into the national electric grid. The new plant will also supply heat to an additional 800,000 m*m of building space.
Rationale
With the increasing number of urban residents, there is an urgent need for providing electrical energy for the city and heating for more than 800,000 m*m of residential building space. The existing power stations of Chengde can not meet the demands. To solve this deficiency, a third stage heat and power station must be implemented. The project will also have positive social benefits, such as energy saving by the central heating system and environmental improvements from the adoption of the new technology.
Outputs

Electrical power generation per annum: 72 million kWH;

Heating: 800,000 sq. meters

Location Chengde city, Hebei province
Available Information (Pre)Feasibility Study, Detailed Project Description
Total Investment (US$)

14.42 million

Foreign Currency (US$)

5.76 million

Financing

Co-operation Sought

Total Equity (US$)

14.42 million

Joint Venture

Of which Equity Foreign Partner (US$)

9.98 million

Cooperative Venture

Loan (US$)
Others(specify) (US$)
Indicators of Viability

Return on investment: 18.48%; Investment profit-tax rate: 23%;

IRR: 19.7%; Pay-back period: 7 years.

INFORMATION ON SPONSOR

Name Chengde Heat & Power Corporation Tel +86-314-2084345
Address Banbishan Road, Xiardaohezi, Chengde city, Hebei province Fax
Annual Turnover (US$) 1993 2.9 million 1994 3.26 million 1995 5 million
Year of Establishment 1990 No. of Employees 645 Ownership State
Fixed Assets (US$) 13.8 million Registered Capital (US$) 11.5 million
Land (ha.) 4.22 Building (m*m) 14,191 Equipment (US$) 8.34 million

 