Brief Profiles Of Investment Projects
For China's Agenda 21

 

Title IGCC Application in the Shenzhen Power Plant
Type Technical renovation
Description
An Integrated Gasification Combined Cycle (IGCC) unit will be developed in the Shenzhen Yueliangwan Power Plant. A 1300 t/day coal gasifier with relevant auxiliary facilities and a coal gas purification system will be constructed. The present distillate burning gas turbine combined cycle will be converted to use syn-gas as the main fuel and distillate as the auxiliary fuel. The gasification system and modified combined cycle will be integrated into the IGCC unit.
Rationale
The emission of air pollutants will be significantly reduced as compared with that of the existing oil burning unit. Implementation of this project will increase electricity generation by about 12 MW and operating efficiency will be increased to 38%.
Outputs
Incremental electrical power generation: 12 MW
Location Nanshan district, Shenzhen city, Guangdong province
Available Information (Pre)Feasibility study by SUNIC company of U.S.
Total Investment (US$)

80 million

Foreign Currency (US$)

Financing

Co-operation Sought

Total Equity (US$)

55 million

Joint Venture

Of which Equity Foreign Partner (US$)

30 million

Cooperative Venture

Loan (US$)

25 million

Others(specify) (US$)
Indicators of Viability

Capital recovery Period: 5 years;

Pay-back Period (new investment): 3 years

 