| Title | Guizhou Panbei Gangue Power Station | |||||||||||||||||||||||
| Type | New power plant construction | |||||||||||||||||||||||
| Description | ||||||||||||||||||||||||
| A 2 x 24 MW gangue power plant will be constructed in Panjiang county, Guizhou province to utilize the waste ganggue discharged from the Panbei Coal Washery. The plant will include QF2-12-2 generator, N12-4.43 turbine, and M2-65/3.82-M boiler. The plant will be connected with the national electric grid, but will use the power generated for internal purpose. Land for construction of the plant has been sited and approved by the local government. | ||||||||||||||||||||||||
| Rationale | ||||||||||||||||||||||||
| The Panbei Coal Washery of the Panjiang Mining Administration discharges gangue in the amount of 438.88 kt annually which results in serious environmental pollution and resource waste. Arable land occupied by gangue wastes will be reclaimed and the use of additional land to store these discharges will be saved. A serious pollution problem will be eliminated, while deriving additional energy from the avoided waste. | ||||||||||||||||||||||||
| Outputs | ||||||||||||||||||||||||
| Electricity generation: 144 million kWH per annum; Electricity sales: 126 million kWH per annum | ||||||||||||||||||||||||
| Location | Special development district of Panjiang county, Guizhou province | |||||||||||||||||||||||
| Available Information | (Pre)feasibility Study, Detailed Project Description, Technical Report, Market Study. | |||||||||||||||||||||||
| Total Investment (US$) | 12 million |
Foreign Currency (US$) |
||||||||||||||||||||||
Financing |
Co-operation Sought | |||||||||||||||||||||||
| Total Equity (US$) | 6.1 million |
Cooperative Venture | ||||||||||||||||||||||
| Of which Equity Foreign Partner (US$) | 2.4 million |
Equipment Purchase, | ||||||||||||||||||||||
| Loan (US$) | 5.9 million |
or BOT | ||||||||||||||||||||||
| Others (specify) (US$) | ||||||||||||||||||||||||
| Indicators of Viability | Annual Profit and Tax: US$ 3.1 million; Pay-back period: 6 years. | |||||||||||||||||||||||
INFORMATION ON SPONSOR | ||||||||||||||||||||||||
| Name | Panjiang Coal Mining Administration | Tel | +86-8262-222292 | |||||||||||||||||||||
| Address | Panjiang county, Guizhou province | Fax | +86-8262-222383 | |||||||||||||||||||||
| Annual Turnover (US$) | 1993 | 61 million | 1994 | 72 million | 1995 | 65 million | ||||||||||||||||||
| Year of Establishment | 1966 | No. of Employees | 25396 | Ownership | State | |||||||||||||||||||
| Fixed Assets (US$) | 118.14 million | Registered Capital (US$) | ||||||||||||||||||||||
| Land (ha.) | 473 | Building (m*m) | 271,032 | Equipment (US$) | 21,810,000 | |||||||||||||||||||