CLEANER PRODUCTION DEMONSTRATION PROJECTIN IRON AND STEEL INDUSTRY
|
1. Project Summary and Relationship to China's Agenda
21
Changchun General Steel Works is preparing to set up a new
steel plant in Xinglongshan in the north-east of Changchun,
where the former casting centre of Capital Steel and Iron
Company was located. The new steelworks will consist of an
electric furnace workshop, a continuous rolling workshop, and
various kinds of auxiliary workshops and facilities. The
plant will adopt a 1990's world-advanced short process steel
smelting technology and produce 300,000 tons of steel per
year. This project covers an area of 1.3 million m2 and a
production construction area of 55,476 m2.
This project is based on programme areas 12B, 13B and 13C
of China's Agenda 21, and
is related to programme area 18A.
2. Background
The iron and steel industry emits enormous amounts of
smoke and dust which contain ferric oxide, sulphur dioxide,
carbon monoxide and carbon dioxide. These green house gases
and toxic gases threaten human health and the growth of
animals and plants. Therefore, the Chinese government has set
strict air quality standards to control the emission of dust
and pernicious gases. In addition, the environmental
protection department has stipulated different measurement
indices and pollution control standards. However, because
production technology is from the 60's and 70's level, enterprises have
faced difficulties in meeting the established standards.
Therefore, the introduction of cleaner production technology,
which can reduce adverse impacts to the environment, is of
great significance for controlling air pollution in China,
especially pollution by the steel and iron industry.
Since the production technology and equipment are
obsolete, the Steel Smelting Plant of Changchun General Steel
Works fails to meet the environmental standards. The factory
emits 3.2 x 106 m3 of smoke and 884 tons of dust annually.
Moreover, the noise near the workshop is as high as to 102
dB. Because the Steel Smelting Plant is located in an urban
area, the pollution has seriously affected local residents.
The Jilin Provincial Government, the Changchun Municipal
Government and the Ministry of Metallurgy have all paid great
attention to this problem and have set a deadline for the
plant to meet the environmental standards. Technological
innovation of the Steel Smelting Plant has been classified as
one of Changchun's eight
key pollution treatment projects. The relocation and
transformation plan of the Steel Smelting Factory has been
listed in the Ninth Five-Year Plan for Jilin's economic and social
development .
Changchun General Steel Works is a medium sized
intermediate steel and iron enterprise. There are more than
one hundred enterprises of this kind in China. The project
will construct a new demonstrating plant which will introduce
foreign advanced technology and equipment for clean
production. The plant will become an important model for
other small-intermediate size iron and steel plants.
The Changchun General Steelworks is the biggest steel and
iron enterprise in the Changchun city, which produces 120
thousand tons of steel and 100 thousand tons of rolled steel
per year. This is short of meeting the needs of Changchun's steel market, which is 400
thousand tons annually. As a result, speeding up the
technical renovation, adopting advanced technology and
equipment, and increasing the productivity of Changchun iron
and steel industry are urgent and necessary. Furthermore,
Changchun is an important production base of the Chinese
motor and machine tool industries. Various kinds of steels
for motor vehicles produced by Changchun General Steelworks
can directly serve the First Automobile Works. Therefore, the
Changchun Municipal Government has decided to relocate the
Changchun General Steelworks and has already chosen the new
factory site and completed a pre-feasibility study. The
project is also listed in the Ninth Five-Year Plan. Under the
leadership of the local government, the Changchun General
Steelworks is preparing for the relocation. Other agencies
involved are the Changchun Planning Commission, the
Environmental Protection Bureau, the Changchun Metallurgy
Bureau and the Ministry of Metallurgy.
3. Objectives
3.1 Long-term Objective
This project seeks to introduce cleaner production in the
iron and steel industry through technical innovation and the
introduction of advanced steel smelting equipment and
production technology. Cleaner production will reduce
pollution by smoke, dust, toxic gas, wastewater, and noise.
The project also plans to set-up a cleaner production model
of steel smelting for other small-intermediate size iron and
steel plants.
3.2 Immediate Objectives
- To construct a new steel smelting factory having modern
equipment, advanced technology, high productivity, good
product quality, new varieties of products which create
little pollution;
- To reduce 75% of smoke emission with dust content less
than 100 mg/m3, and the noise level below 80 dB. This
will significantly improve the environmental quality and
will provide valuable experience to the metallurgy
industry.
4. Outputs and Activities
4.1 Establish plans for dismantling the old factory and
constructing a new factory
- To decide on the equipment to be removed and work out an
equipment dismantling schedule. The item will also set up
a safe treatment plan for waste residue, furnace ashes
and solid wastes;
- To formulate an implementation plan for the construction
of the new steelworks.
Monitoring Indicators: Develop a plan for dismantling the
existing factory and constructing the new factory
Implementing Agencies: Changchun Environmental Protection
Bureau, Changchun General Steelworks and the Ministry of
Metallurgy.
Time Schedule: January 1997 - December 1997
4.2 Environmental impact assessment, and technical and
economical feasibility study of the new factory
- To evaluate the amount of total waste emission of the new
factory and environmental situation after its
construction;
- To evaluate the technical plan and introduce the
equipment for the new steelworks;
- To create a product plan according to market need;
- To evaluate the future financial and economic conditions
in the new factory.
Monitoring Indicator: Feasibility study
Implementing Agencies: Changchun General Steelworks, the
Ministry of Metallurgy.
Time Schedule: January 1997 - December 1997
4.3 Feasibility study for financing the new plant and
investment promotion activities
- To estimate the capital needed for the new factory;
- To explore support from foreign investors, donors and
banks;
- To determine the condition and motive of domestic and
foreign investors.
Monitoring Indicator: Determination of international aid
and co-operating agencies
Implementing Agencies: Changchun General Steelworks, the
Ministry of Metallurgy.
Time Schedule: March 1997 - March 1998
4.4 The importation, installation and commissioning of
clean production equipment and technology for the new
steelworks.
- To introduce one 75T ultrahigh power DC ore furnace, one
80 LF ladle finer, a set of R7-4 square billet continuous
casting machines and a set of continuous rolling
machines;
- To introduce technical materials on clean steel smelting,
including drawings and standards; invite foreign experts
for consultation;
- To send technical personnel from steelworks to take part
in the training of new technology and equipment organised
by the exporting companies;
- To install and commission imported equipment.
Monitoring Indicators: 75T ultra-high power DC arc
furnace, 80 LF ladle finer and R7-4 square billet continuous
casting machine and continuous rolling machine in the test
run state.
Implementing Agencies: Changchun General Steelworks, the
Ministry of Metallurgy.
Time Schedule: January 1998 - March 1999
4.5 Capacity building and demonstration
- To organise technical exchange among domestic and foreign
personnel and to organise of study and inspection of
advanced technology and equipment abroad;
- To formulate a promotion plan for cleaner production
technology;
- To organise a conference on small-intermediate steelworks
technology and finance.
Monitoring Indicators: Train 100 technical and management
personnel for Changchun General Steelworks; promote this
technology to 5-10 similar steelworks.
Implementing Agencies: The Ministry of Metallurgy,
Changchun General Steelworks and other relevant
organisations.
Time Schedule: January 1997 - December 1999
5. Inputs
5.1 Chinese Inputs
Domestic input will be mainly used for the equipment input
of the new steelworks and the earlier stage preparation work
and capacity construction of the project.
5.2 International Inputs
International input will be mainly in the form of loan and
direct investment (or joint venture), which will be used for
the introduction, installation and commissioning of foreign
equipment and technology; the grant will be mainly used for a
feasibility study and planning the project implementation.
5.3 Budget
The implementation of this project requires US$ 61.7
millions (not including unforeseen expenses, reserve fund for
price increase, and loan interest). Domestic capital input is
US$ 25.7 millions. foreign capital input is US$ 36 millions.
Table 1. Budget by Item (in million US
dollars)
| Item |
Total |
Chinese Inputs |
International Inputs |
| Subtotal |
Grant |
Loan |
Local
Contribution |
Subtotal |
Grant |
Loan |
Direct
Investment |
| Experts |
0.30 |
0.10 |
|
|
0.10 |
0.20 |
0.20 |
|
|
Feasibility
Study |
0.80 |
0.40 |
0.20 |
|
0.20 |
0.40 |
0.40 |
|
|
Procurement
of Facilities |
60.00 |
25.00 |
3.00 |
20.00 |
2.00 |
35.00 |
|
30.00 |
5.00 |
Capacity
Building
and
Dissemination |
0.60 |
0.20 |
0.20 |
|
|
0.40 |
0.40 |
|
|
| Total |
61.70 |
25.70 |
3.40 |
20.00 |
2.30 |
36.00 |
1.00 |
30.00 |
5.00 |
Table 2. Budget by Output (in million
US dollars)
| Output |
Total |
Chinese Inputs |
International Inputs |
| Subtotal |
Grant |
Loan |
Local
Contribution |
Subtotal |
Grant |
Loan |
Direct
Investment |
| 4.1 |
0.40 |
0.20 |
0.10 |
|
0.10 |
0.20 |
0.20 |
|
|
| 4.2 |
0.40 |
0.20 |
0.10 |
|
0.10 |
0.20 |
0.20 |
|
|
| 4.3 |
0.30 |
0.10 |
|
|
0.10 |
0.20 |
0.20 |
|
|
| 4.4 |
60.00 |
25.00 |
3.00 |
20.00 |
2.00 |
35.00 |
|
30.00 |
5.00 |
| 4.5 |
0.60 |
0.20 |
0.20 |
|
|
0.40 |
0.40 |
|
|
| Total |
61.70 |
25.70 |
3.40 |
20.00 |
2.30 |
36.00 |
1.00 |
30.00 |
5.00 |
6. Benefits
After the project is completed, the air quality in
Changchun city will be clearly improved. The emission of
smoke, dust and suspended solids from the steel smelting
factory will be reduced by 75%. The residents and schools
near the original steelworks will be relieved of the
pollution problem. The annual sales income of the new
steelworks will reach RMB 1.015 billion yuan with a profit of
198.65 million yuan.
7. Risks
The main problem faced by the project is the shortage of
capital. Therefore, the implementing agencies should raise
RMB 47 million yuan through government grants and local
contributions. Meanwhile, the agencies should promote the
investment opportunity to the international community, so
they can obtain international aid, bank loans and