3 - 6
COMPREHENSIVE UTILISATION OF VANADIUM AND
TITANIUM RESOURCES IN THE PANZHIHUA AREA
|
1. Project Summary and Relationship to China's Agenda
21
The goal of this project is to improve enterprise
management and technology, and accelerate the change of local
economic growth from an extensive to an intensive mode.
Specifically, it seeks to expand and increase the utilisation
of vanadium and titanium resources, reduce waste of
resources, control environmental pollution and bring economic
benefits to the enterprises involved.
This project is based on programme areas 12B and 14A of
China's Agenda 21, and related to programme areas 2B, 6D,
12C, 14G and 19A.
2. Background
The Panzhihua area of Southwest China's Sichuan province is very
rich in resources. Its mineral resources include paragenesis
vanadium (V) and titanium (Ti) with magnetite. The vanadium
and titanium reserves account respectively for 6.7% and
35.17% of world totals. Hydropower, coal and metal ores are
abundant. The area is the largest steel and energy base in
south-west China.
In the early 1970's,
China organised a large scale research project on the
comprehensive utilisation of ferro-vanadium and titanium
magnetite in the Panzhihua area. Much has been achieved since
then, including: the technology of ferro-vanadium and
titanium magnetite smelting in conventional blast furnaces; a
new process of atomised vanadium extraction; a unique process
of extracting titanium from abandoned tailings and vanadium
from steel slag. Environmental pollution was reduced while
the resource utilisation rate was increased. The production
capacity of vanadium slag accounts for 75% of China's total, and that of titanium
concentrates for 25%-30% .
Due to several factors, including insufficient technical
capability and capital, the utilisation rate of many of the
resources is still low. For example, for paragenesis V-Ti
magnetite containing more than 20 kinds of rare metals, the
utilisation rates of iron, vanadium, titanium and cobalt are
only 68%, 20%, 5% and 13% respectively. The remaining
non-ferrous metals, such as Cr, Ni, Sc and Ga are all
discharged or dumped with abandoned wastes. Calculated on the
basis of monetary value, the effective utilisation rate of
these resources is only 8%. The full utilisation and further
exploitation of vanadium and titanium resources is therefore
the key to improving the utilisation of V-Ti magnetite,
changing the local pattern of economic growth and reducing
the cost of environmental protection. Panzhihua municipal
government and the implementing agency of this project,
Panzhihua Iron and Steel (Group) Company, have decided to
take positive measures to accelerate the change of the
pattern of economic growth and the implementation of China's
Agenda 21. In the following years, the scale of steel
production will not be further enlarged. Rather, economic
development will focus on more effective utilisation of the
various mineral resources, thereby benefiting the economy,
the environment and society at large.
The development of Panzhihua is very important for the
economic growth of Sichuan province. The comprehensive
utilisation of Panzhihua's V-Ti magnetite has an especially
important, strategic role in the development of southwest
China and China's overall production distribution.
Incorporated into the National Key Projects of the Seventh
and Eighth Five-Year Plans, the comprehensive use of
Panzhihua's vanadium and titanium resources continues to be
listed as a National Key Project in the Ninth Five-Year Plan.
China's central
government and Sichuan provincial government have paid much
attention to this project. The State Planning Commission
(SPC) has mobilised scientific and technical power all over
the country to speed up the progress of the project. Sichuan
province has established a pilot zone, formulated favourable
policies, increased investment, and established a special
office for the comprehensive development of resources
development in the Panzhihua and Xichang areas. An important
part of the Overall Development plan of Panzhihua Iron &
Steel (Group) Co., this project has been reviewed by the
Ministry of Metallurgical Industry of China (MMI) and
approved by the SPC.
Panzhihua Iron & Steel (Group) Co. has 10 billion RMB
of fixed assets. Its annual sales revenue is 7.5 billion RMB
and import & export trading volume is 190 million US
dollars. The company has invested 700 million RMB and
achieved an annual production capacity of 110,000 tons of
vanadium slag, 2,000 tons of bi-vanadium pentoxide, 3,000
tons of Ferro-vanadium, 100,000 tons of titanium concentrate,
4,000 tons of titanium dioxide, with corresponding capacities
for titanium alloys and fine chemical products. The installed
capacity of the coal-fired power plant in Panzhihua city is
700 MW. The 3.3 GW Ertan hydropower station, currently under
construction, will be put into operation in 1998 and provide
sufficient energy to support further development of the
comprehensive utilisation of V-Ti resources. With 20,000
technical staff, the Research Institute of the Panzhihua Iron
& Steel (Group) Co. is a world leader in the field of
vanadium and titanium resource development.
In order to implement this project, feasibility studies,
project design and budget calculations have been made for
several sub-projects. These sub-projects are expansion of the
Sulphuric Acid Production Plant, the Alkali and Chloride
Production Plant, the bi-Vanadium Pentoxide Plant and the
Ferro-vanadium Plant, and Comprehensive Utilisation of Waste.
Some of these sub-projects have started. An advantage for
this project is that the production of titanium concentrates
and vanadium slag is supported by favourable national tax
policies on waste reclamation.
3. Objectives
3.1 Long-term Objectives
To reduce waste of resources and pollutant emissions by
improving technologies and production capacities so as to
achieve a complete and effective use of all mineral
resources. To establish a development model for China and
other developing countries by introducing and experiencing a
new development mode in a resource-rich area.
3.2 Immediate Objectives
- Through scientific research, technical development and
international technical co-operation, to improve the
technical level of comprehensive resources utilisation
and master the techniques of effective use and intensive
processing of resources;
- To achieve a V-Ti magnetite utilisation rate of 40% by
establishing a process line or production plant for
extracting vanadium and titanium and comprehensively
using the slag and liquid wastes;
- To establish a management system for resource utilisation
and environmental protection. This system will monitor
the use of resources and environmental protection, and
thereby promote resources conservation and reduce
pollutant emissions.
4. Outputs and Activities
4.1 Improve the level of titanium resources utilisation
- Build a new titanium concentrate production line with a
capacity of 100,000 tons per year;
- Carry out research and development and establish a
production line for recovering fine grained of titanium
concentrate so as to increase output of titanium
concentrate by 100,000 tons per year;
- Build a production line for extracting useful elements
from tailings and produce 100,000 tons of ferrous
concentrates and 80,000 tons of titanium concentrates per
year;
- Produce 10,000 tons annually of titanium tetra-chloride
from blast furnace iron slag.
Monitoring Indicators: increased annual output of titanium
concentrate by 280,000 tons and titanium tetra-chloride by
10,000 tons; increased resources utilisation rate from 5% to
20%.
Implementing Agency: Panzhihua Iron & Steel (Group)
Co.
Time Schedule: January 1997 - December 1998
4.2 Increasing the production of high quality titanium raw
material and titanium dioxide products
- Introduce or jointly design a large-scale enclosed
electric furnace and its process control technology, and
build a production plant with an annual output of 100,000
tons high titanium content products;
- Introduce or jointly design a process of waste acid
condensation and futile and potassium fertiliser
production from waste acid so as to meet the requirement
of consuming over 200,000 tons of waste acid per year,
and build a titanium dioxide production plant with an
annual output of 40,000 tons by the sulphuric acid
process;
- Introduce or jointly design a chloride process for
producing titanium dioxide, and construct a titanium
dioxide production plant with an annual output of 60,000
tons.
Monitoring Indicators: completion of the project; all
processes running smoothly; production targets being met.
Implementing Agency: Panzhihua Iron & Steel (Group)
Co.
Time Schedule: January 1997 - December 2002
4.3 Developing vanadium products with the aim of energy
and material saving
- Construct a V2O3 plant with annual output of 2,500 tons
per year.
Monitoring Indicators: Completion of plant construction;
plant meeting annual production target of 2,500t V2O3.
Implementing Agency: Panzhihua Iron & Steel (Group)
Co.
Time Schedule: January 1997 - December 1998
4.4 Capability building
- Set up a resource management information system for the
production of vanadium and titanium products;
- Improve the environmental management system;
- Carry out cleaner production auditing;
- Conduct training for the managerial and technical staff
of Panzhihua Iron & Steel (Group) Co.
Monitoring Indicators: finish cleaner production auditing
on main production processes in Panzhihua Iron & Steel
(Group) Co.; all the high level managerial and technical
staff have received training.
Implementing Agency: Panzhihua Iron & Steel (Group)
Co.
Time Schedule: January 1997 - December 2000
5. Inputs
5.1 Chinese Inputs
Chinese inputs mainly include land, equipment and raw
materials for project construction; transportation, office
and communications facilities, and accommodation for project
implementation personnel; the existing domestic technical
documentation and monitoring data; Chinese specialists and
engineering personnel; partial funding of the project.
5.2 International Inputs
International inputs mainly include: production and
process control technology of titanium slag smelting
equipment; process control technology for titanium dioxide
production with chloride process; technology for waste acid
condensation, futile production from waste acid, and
potassium fertiliser production; training of technical
personnel; part of investment for high-quality vanadium slag
plant, titanium dioxide plant with sulphuric acid process,
titanium dioxide plant with chloride process and V2O3
workshop. (The implementing agency will be responsible for
paying back the loan, with interest)
5.3 Budget
The total capital needed for this project is US$ 294.05
million. The Chinese partners will raise US$ 213.42 million,
while foreign aid and investment will cover the other US$
80.63 million.
Table 1. Budget by Item (in million US
dollars)
| Item |
Total |
Chinese Inputs |
International Inputs |
| Subtotal |
Grant |
Loan |
Local
Contribution |
Subtotal |
Grant |
Loan |
Direct
Investment |
Foreign
Experts |
0.72 |
|
|
|
|
0.72 |
0.24 |
|
0.48 |
| Training |
2.18 |
1.20 |
0.60 |
|
0.60 |
0.98 |
0.25 |
|
0.73 |
Equipment
and
Construction |
225.06 |
164.82 |
2.16 |
96.39 |
66.27 |
60.24 |
|
|
60.24 |
| Contingency |
66.09 |
47.40 |
|
26.02 |
21.38 |
18.69 |
|
|
18.69 |
| Total |
294.05 |
213.42 |
2.76 |
122.41 |
88.25 |
80.63 |
0.49 |
|
80.14 |
Table 2. Budget by Output (in million
US dollars)
| Output |
Total |
Chinese Inputs |
International Inputs |
| Subtotal |
Grant |
Loan |
Local
Contribution |
Subtotal |
Grant |
Loan |
Direct
Investment |
| 4.1 |
24.09 |
24.09 |
2.40 |
8.44 |
13.25 |
|
|
|
|
| 4.2 |
251.23 |
178.32 |
|
107.22 |
71.10 |
72.91 |
|
|
72.91 |
| 4.3 |
17.59 |
10.36 |
|
6.75 |
3.61 |
7.23 |
|
|
7.23 |
| 4.4 |
1.14 |
0.65 |
0.36 |
|
0.29 |
0.49 |
0.49 |
|
|
| Total |
294.05 |
213.42 |
2.76 |
122.41 |
88.25 |
80.63 |
0.49 |
|
80.14 |
6. Benefits
This project will benefit the economy, the environment and
society at large. By introducing comprehensive utilisation of
resources, estimated production value will be US$ 310 million
with annual profits of about US$ 88.3 million. The payback
period of the main sub-projects will be from 6.5 to 8 years.
On completion the project, the operation and production of
Panzhihua Iron & Steel (Group) Co. will have greatly
improved, the company will be well able to meet the demands
of the market, and a major step will have been achieved in
changing the Panzhihuaís mode of economic growth from
extensive to intensive. The implementation of this project
will provide a good example of increasing job opportunities,
eliminating poverty and improving the economy of a region of
ethnic minorities. By greatly increasing the utilisation
level of resources, reducing waste emissions, and speeding up
the implementation of cleaner production, the project will
contribute to environmental protection.
7. Risks
The project faces three main problems. First, the market
for titanium dioxide produced with the sulphuric acid process
is very competitive and the product price is likely to
fluctuate. The way out is to improve the product quality and
reduce production costs to make the product more competitive.
Second, the market might not be able to fully satisfy the
projectís intensive demands for electric power, oxygen
and sulphuric acid. To help overcome this potential problem,
the auxiliary projects will maximise self-sufficiency in the
production of these three inputs. Finally, the technology for
developing paragenesis V-Ti magnetite is much more difficult
than that for common mineral resources, so technology
research and development must be accelerated.