|
5 - 6
Waste Tires Reclamation And Marketing Secondary Resources
|
1. Project Summary and Relationship to China's Agenda
21
This project seeks to improve the environment through
recycling the resources and raising the level of secondary
resource reclamation in the industrial processes. Measures
will be taken to reclaim waste rubber and other waste
resources in an orderly and standardised way. This will
reduce energy consumption and promote sustainability in the
rubber industry.
This project is based on programme area 19D of China's Agenda 21, and is related to
programme areas 12C and 14A.
2. Background
By the end of this century, China is expected to produce
0.85-0.90 million tons of waste rubber annually, 2 million
tons of waste plastics, 4 million tons of waste steel, 1
million ton of non-ferrous waste metals and 10 million tons
of waste glass. In addition, there are hundred thousands of
industrial slag containing non-ferrous and precious metals,
waste liquid and slag from paper mills and oil factories.
Secondary resources reclamation could result in substantial
benefits for the Chinese economy and environment.
Research on reclaiming waste rubber has been conducted as
key research projects of Chinaís Eighth Five-Year
Plan. This project is under the administration of the
Ministry of Internal Trade, which is also responsible for
recycling parts of automobiles.
This project is expected to be placed on China's Ninth Five-Year Plan for the
Development of Science and Technology. Waste rubber
reclamation is in line with the overall industrial scope of
our country. Reclamation will promote the development of
chemical, mechanical industries and environmental protection.
It was during the Eighth Five-Year Plan when problems of
reclamation of waste rubber and the quantities of waste tires
from rapid development of the automobile industry emerged.
The Ministry of Internal Trade organised experts to carry out
a series of research dealing with waste tires. These have
already been a series of achievements in scientific research
in tire pulverising equipment, techniques for activating and
modifying rubber powder, compounding and preparation of
various catalytic, active agents and modifiers along with
testing and improving the performances of products. The
overall goal of this research was to identify out an
economically feasible and creative way to handle the growing
amount of waste tires. These techniques have already been put
to use in major national projects. For the Ninth Five-Year
plan, one of the priority projects for the Ministry of
Internal Trade will be effective replication of this project.
Efforts will be made to renew techniques for waste rubber
reclamation, and elimination of long term environmental
pollution. The enforcement body of the project will be
national major technology institutes and universities which
possess professional technological capabilities and advanced
equipment.
3. Objectives
3.1 Long-term Objective
Consolidate and disseminate the techniques of waste tire
reclamation; establish a factory with technologically
advanced foreign enterprise. With newly acquired technology
and advanced foreign facilities, we can further extend the
industrial scope of exploiting new resources from waste
materials such as waste tires and rubber. The ultimate goal
is to make the technology and management for resources
reclamation on par with world standards. This will contribute
to global environmental protection.
3.2 Immediate Objectives
- Explore techniques for reclaiming different grades of
rubber waste;
- Transform existing equipment in a rubber reclamation
factory, cut down the consumption of energy, eliminate
pollution. During the Ninth Five-Year, establish a
demonstration enterprise which will produce 10 thousand
tons of active and modified rubber powder each year and
related high profit products;
- Establish a trading market information network and
management system for waste rubber and waste material.
4. Outputs and Activities
4.1 Exploration and importation of new technology and
equipment for waste tires reclamation
- Import high efficiency, low energy consumption waste
tires pulverising equipment.
- Research the techniques of activating and modifying crude
rubber powder, and solve the problem of how to compound
and prepare active agents and modifiers;
- Explore the technology of comprehensive utilisation of
waste tires and non-rubber.
Monitoring Indicators: waste tires and non-rubber
comprehensive utilisation technology, activating and
modifying rubber powder technology to achieve international
standard.
Implementing Agencies: Guangzhou Resources Reclamation
Institute, Shenyang Reclaimed Rubber Factory.
Time Schedule: January 1997 - December 1999
4.2 Establishment of industry of waste tires reclamation
by adopting advanced techniques and transform existing
technology of reclaiming rubber
- Import foreign equipment for rubber pulverisation, active
agents and modifier compounds for the production of
active and modified rubber powders. Establish two
examples for producing 10 thousand tons of rubber powder
per year in Guangzhou and Beijing. Establish five to ten
demonstration industries for active and modified rubber
powder;
- With existing advanced techniques, foreign equipment and
funds, reform and renew Shenyang reclaimed rubber
enterprise which produces 10 thousand tons of reclaimed
rubber each year.
Monitoring Indicators: two examples of dealing with waste
tires and comprehensive utilisation waste tires; Set up one
enterprise of reclaiming waste rubber; Put five to ten kinds
of products on the market.
Implementing Agencies: China National Resources
Reclamation Corp., Shinnying reclaimed rubber factory.
Time Schedule: January 1997 - December 2000
4.3 Marketing waste materials in Wuhan
- Establish an information network for trading in waste
materials marketplace;
- Establish a warehouse for trade and storage of waste
materials.
Monitoring Indicators: waste materials (metal) marketplace
and information network system.
Implementing Agencies: China National Resources
Reclamation Corp., Wuhan Means of Production Corp.
Time Schedule: January 1997 - December 1999
5. Inputs
5.1 Chinese Inputs
Chinese resources will be used in developing national and
departmental techniques, research and production of equipment
and establishing projects with funds raised by local
enterprises.
5.2 International Inputs
International resources will be used to invite foreign
specialists to give guest lectures; training 30 senior
technical personnel for the comprehensive utilisation of
waste rubber and other waste materials; training 15 people
with management experience in waste materials and 15 people
with management experience in trading, importing technology
including the purchase of instruments and equipment, etc..
5.3 Budget
Total funding for this project is US$ 21.20 million,
including US$ 11.20 million from the Chinese and US$ 10
million from the international community.
Table 1. Budget by Item (in million US
dollars)
| Item |
Total |
Chinese Inputs |
International Inputs |
| Subtotal |
Grant |
Loan |
Local
Contribution |
Subtotal |
Grant |
Loan |
Direct
Investment |
| Experts |
0.10 |
|
|
|
|
0.10 |
0.10 |
|
|
| Training |
0.30 |
|
|
|
|
0.30 |
0.30 |
|
|
| Experiment |
4.50 |
2.00 |
0.50 |
|
1.50 |
2.50 |
|
1.00 |
1.50 |
| Research |
2.50 |
1.50 |
1.00 |
|
0.50 |
1.00 |
0.50 |
|
0.50 |
| Technology |
5.00 |
1.50 |
|
|
1.50 |
3.50 |
0.50 |
2.00 |
1.00 |
| Materials |
0.10 |
|
|
|
|
0.10 |
0.10 |
|
|
| Building |
8.50 |
6.00 |
|
1.00 |
5.00 |
2.50 |
|
1.50 |
1.00 |
| Contingency |
0.20 |
0.20 |
0.10 |
|
0.10 |
|
|
|
|
| Total |
21.20 |
11.20 |
1.60 |
1.00 |
8.60 |
10.00 |
1.50 |
4.50 |
4.00 |
Table 2. Budget by Output (in million
US dollars)
| Output |
Total |
Chinese Inputs |
International Inputs |
| Subtotal |
Grant |
Loan |
Local
Contribution |
Subtotal |
Grant |
Loan |
Direct
Investment |
| 4.1 |
4.00 |
1.60 |
1.60 |
|
|
2.40 |
0.40 |
|
2.00 |
| 4.2 |
10.80 |
6.00 |
|
1.00 |
5.00 |
4.80 |
0.30 |
2.50 |
2.00 |
| 4.3 |
6.40 |
3.60 |
|
|
3.60 |
2.80 |
0.80 |
2.00 |
|
| Total |
21.20 |
11.20 |
1.60 |
1.00 |
8.60 |
10.00 |
1.50 |
4.50 |
4.00 |
6. Benefits
This project will promote reclamation and comprehensive
use of secondary resources, cut down the consumption of
energy and lower environment pollution. The establishment of
a prototype production line, which will be above the minimum
economic scale, and renewing reclaimed rubber factory will
produce direct economic benefit of 2.4 million Yuan per year.
The standardisation of the market and management will promote
the development of a trading system for reclaimed secondary
resources. The prototype line will produce latent economic
benefits of 100 million yuan. The production of reclaimed
rubber will bring economic benefits of 800-900 million yuan
for China. It will mitigate the serious deficiency in the
supply of nature and synthetic rubber and strongly promote an
increase in the volume of reclaimed rubber.
7. Risks
In recent years, the unreasonable tax policy and price of
waste material obstructed the development of national
resources reclamation and resulted in depression of the
reclamation trade. The Ministry of Internal Trade and
departments concerned will establish rules, regulations and
laws for standard management and administration in the trade
of reclaimed resource. Government agencies and enterprises
will co-ordinate the efforts to solve the problems of lack of
funding for reclamation activities.
Text Browser Utilities: |Back| |ACCA21
Home|
|